Frederick Douglas Memorial Bridge Abatement

Location:
Washington, DC
Project Dates:
July 2021- August 2021
Role:
Subcontractor
Owner:
District Department of Transportation (DDOT)
General Contractor
Walsh Group
Point of Contact:
Polina Tymoshenko
POC Email:
ptymoshenko@walshgroup.com
POC Phone Number
(347) 480-0082
Summary of Work
Performed lead abatement and torch cut the girders during the demolition of Firth Sterling, Suithland and Howard Bridges during the of the old bridge structure and performed asbestos abatement in main Douglass Memorial Bridge Turntable.

SIMILAR PROJECTS